|
Internal systems should be supported by using a support assembly
fixed on top of the first floor/ceiling joist. A Firestop plate is also
required fixed to the ceiling below. The clamp plate and firestop have
tags fixed to ensure 50mm distance to combustibles. In a normal
house, when passing through the second floor the only requirement
is two firestop plates because the system is adequately supported at
first floor level.
Available in Light and Heavy Duty options
|